Language
简体中文
ENG
Françh
Russian
Portugal
Spain
HBP has provided a large number of oil and gas processing equipment to AHDEB oilfield, Halfaya oilfield and Missan oilfield in Iraq since 2010. 1.HBP provided the main equipment for CPF of AHDEB oilfield and undertook the oil and gas processing principal engineering of CPF...
HBP has provided totally over 150 pieces (sets) of equipment including filter separators, cyclone separators, heating surface skids, production separator skids, metering separator skids, natural gas filters etc. to the oilfields of Kazakhstan-CNPC AKTOBE Oil and Gas Co., L...
4 high pressure testing separators provided by HBP to phase I UEPL testing separator project in 2013; 1 high pressure testing separator provided by HBP to phase II UEPL testing separator project in 2013; HBP won the bid for phase III UEPL testing separator project (6 high ...
HBP has proposed the business concept risky trial and provided users with an energy saving type high-efficiency separator sticking to the scientific and strict attitude on the basis of deep oilfield investigation, for purposes of solving the problems involving high water c...
1.Oily sewage treatment and oil sludge incineration heat energy utilization project of Liaohe oilfield (annual treatment capacity 21000 tons) The plant was built and put into production in Sept. 2006 and has run up to now. The project was awarded grade I science and techno...
HBP won the bid for four sets of oil, gas and water separator skids of FPSO 113 and six WHP platform test separator skids of BZ25-1 offshore oilfield as well as FPSO Youyi production separator skids and slug flow catcher skids of Bonan offshore oilfield in the localization...
HBP has successively provided 10 sets of separator skids and 3 sets of heating furnace skids for RONIER oilfield and BAOBAB oilfield in Chad since 2009. All of the...
Cyclone separator and filter separator of PetroChina Uzbekistan Company Uzbekistan flare project
HBP entered Iran market in 2011, won the bid for the EP engineering of Iran MIS oilfield development project and provided 24 pieces (sets) of main oil and gas proc...
Cyclone separator and filter separator for Turkmenistan Bagtyyarlyk natural gas gathering and transportation project
provided combined heating separators and combined heating electric dehydrations to Ecuador National Andes Petroleum Company in 2007. The oil and gas processing equ...
54 pieces/sets of land oil and gas processing equipment of Peru PERENCO Company include: flares, metering skids, instrument air skids, various pump skids, hot oil ...
three France companies of strong strength in the competitive bidding and won the bid for the oil and gas processing equipment (including 8 production separator ski...
HBP began to enter the market in Kuwait in 2009 and has successively provided 10 sets of truck-mounted and skid-mounted testing separators and 1 set of sludge trea...
HBP favorably won the bid for the surface testing and metering device system of the oil and gas field of Syria National Oil Company at the end of 2004. The device ...
HBP has provided totally over 110 pieces (sets) of equipment including production separator skids, heating separator skids, flare liquid separation tanks, pressure...
Bei-I-2 light hydrocarbon transportation system Bei-I-2 fire water tank Tower The project is an EPC project, its owner is Natural Gas Company of Daqing Oilfield Co...
1. Daqing fixed sludge station----plant area 2.Daqing fixed sludge station----tank farm 3.Daqing fixed sludge station----automatic feeding device 4.Daqing fixed sl...
In recent years, HBP has established the development guideline Technological Innovation and Serving Oilfields. With the low shear flow controller (a patented produ...
Our company successfully won the bidding for 4 sets of truck-mounted surface testing equipment and 2 sets of skid-mounted mobile surface equipment of GWDC in 2010,...
HBP has participated in the construction of Yong-Hu-Ning crude oil transmission pipeline engineering and Sichuan-Shanghai natural gas transmission pipeline enginee...
Automatic control system for equipment device International l Water jacket heater automatic control system for Phase II Project, Chad l Water jacket heater automat...
With gradually deep exploration and development of oilfields, they have entered a high water cut stage, their oil production has begun to decrease, and production ...
Copyright©2014 All Rights Reserved HBP Beijing ICP Certificate No. 080047 Website construction: Beijing Fractal Technology Co. Ltd.